Training: introductory missions
The electric slide-lever signal box step by step: point levers with a detection lamp, the route-signal lever to 45° (locking) and 90° (signal), putting it back after the run, trains crossing on tracks 1 and 2, the auxiliary button for a route the train has not released.
Play for free in your browser – no installation, no account.
Language: Polski · English · Deutsch · Українська · Čeština · Slovenčina · Français · Español · Italiano