End of line 105 Muszyna – Krynica-Zdrój, beyond Powroźnik; Krynica-Zdrój, powiat nowosądecki, woj. małopolskie.
Terminus of the single-track line from Muszyna in the spa town of Krynica-Zdrój: three main tracks ending at buffer stops by two platforms and two unused sidings. Every train terminates here, and its set runs empty to Powroźnik (5 km) for cleaning; before departure it comes back empty from there – so twice as many trains use the single open line as there are passenger trains.
Polregio regional trains to Nowy Sącz and Tarnów, TLK to Kraków and beyond; all of them terminate heretheir sets run empty to Powroźnik and come back before departure, and the engine of the TLK set runs round its coaches via track 1b. No freight traffic.
Workstation: computer. Difficulty: 2/5.
Play for free in your browser – no installation, no account.
Language: Polski · English · Deutsch · Українська · Čeština · Slovenčina · Français · Español · Italiano